← ExplorePanama Canal expansion project

Image: Mariordo (Mario Roberto Durán Ortiz) · CC BY-SA 4.0

Panama Canal expansion project

landmarkPanama City, PAN

2007–16 construction of larger locks on Panama Canal

The Panama Canal expansion project, also called the Third Set of Locks Project, doubled the capacity of the Panama Canal by adding a new traffic lane, enabling more ships to transit the waterway, and increasing the width and depth of the lanes and locks, allowing larger ships to pass. The new ships, called New Panamax, are about one and a half times larger than the previous Panamax size and can carry over twice as much cargo. The expanded canal began commercial operation on 26 June 2016.

8.9847, -79.5892 · Open in map · Wikipedia